This Service Operation Vessel (SOV), the second of four, is based on the VARD 4 19 design and was built for long-term Operations & Maintenance (O&M) work at the Dogger Bank offshore wind farm.
Adapted in collaboration with North Star, she ensures efficient operations in the challenging North Sea, 130 km off the English coast.
The vessel is equipped with a diesel-electric propulsion system with hybrid battery management, Voith eVSP propulsion, and a retractable drop-down azimuth thruster.
Vard Electro’s SeaQ power package provides full control of onboard systems. Together, these solutions reduce fuel consumption, lower emissions, and enhance safety and responsiveness.
LENGTH OVERALL (M) = 85.5
BREAD MOULTED (M) = 19.5